This document serves as a template for recording periodic inspections of Elebia automatic hooks. Complete one form per inspection and keep it with the hook's maintenance records.
Inspection Details
| Field | Information |
|---|---|
| Date | ________ / ________ / ________ |
| Performed by | _________________________________ |
| Equipment SN | _________________________________ |
| Location | _________________________________ |
| Service Type | ☐ Annual Inspection ☐ Major Service ☐ Repair Follow-up ☐ Other: |
| Partial Cycles (since last service) | _________________ cycles |
| Total Cycles (hook lifetime) | _________________ cycles |
Inspection Checklist
| Check Item | Pass | Fail | Notes |
|---|---|---|---|
| Legible CE plate (WLL, serial number, SF, …) | ☐ | ☐ | |
| LEDs fully operational (only applicable if bumper with LEDs is installed) | ☐ | ☐ | |
| Complete hook range of motion | ☐ | ☐ | |
| Proper safety latch movement (not applicable if rigid latch installed) | ☐ | ☐ | |
| Stretched, bent, twisted, distorted, elongated, cracked or broken load-bearing components | ☐ | ☐ | |
| Excessive wear (more than 5%) | ☐ | ☐ | |
| Cracks, nicks or gouges | ☐ | ☐ | |
| Excessive pitting or corrosion | ☐ | ☐ | |
| Heat damage | ☐ | ☐ | |
| Evidence of welding or modification | ☐ | ☐ | |
| Total cycles are below the Service life | ☐ | ☐ | |
| Other conditions: _________________________________ | ☐ | ☐ |
Signature and/or Stamp
| Technician Signature | _________________________________ |
| Company Stamp | _________________________________ |
| Date | ________ / ________ / ________ |
Notes / Observations
text
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
Instructions:
- Complete all fields in the "Inspection Details" section before starting.
- For each item in the checklist, mark Pass or Fail.
- Add any relevant notes or observations in the "Notes" column.
- If any item fails, the hook must be removed from service until the issue is resolved.
- Sign and stamp the document upon completion.
- Keep this record with the hook's maintenance file for future reference.